Reliability-based design (RBD) ensures high reliability with a reduced cost. Most of the RBD methodologies do not account for maintenance and warranty actions. As a result, the RBD result may not be truly optimal in terms of lifecycle reliability. This work attempts to integrate reliability, maintenance, and warranty during RBD. Three RBD models are built. The total cost of production, maintenance, and warranty are minimized. The computational procedures for solving the RBD models are developed. As demonstrated by two examples, the proposed RBD models meet not only the initial reliability requirement but also the maintenance and warranty requirements with reduced costs.
Issue Section:
Research Papers
1.
Blischke
, W.
, and Murthy
, D. N. P.
, 2000, Reliability Modeling, Prediction, and Optimization
, Wiley
, New York
, pp. 3
–6
.2.
Liu
, Y.
, and Huang
, H. Z.
, 2009, “Comment on “A Framework to Practical Predictive Maintenance Modeling for Multi-State Systems” by Tan C.M. and Raghavan N. [Reliab Eng Syst Saf 2008; 93(8): 1138–50]
,” Reliab. Eng. Syst. Saf.
0951-8320, 94
(3
), pp. 776
–780
.3.
Mahadevan
, S.
, 1997, “Physics-Based Reliability Models
,” Reliability-Based Mechanical Design
, T. A.
Cruse
, ed., Dekker
, New York
, pp. 197
–232
.4.
Tu
, J.
, Choi
, K. K.
, and Park
, Y. H.
, 1999, “A New Study on Reliability-Based Design Optimization
,” ASME J. Mech. Des.
0161-8458, 121
(4
), pp. 557
–564
.5.
Youn
, B. D.
, Choi
, K. K.
, and Du
, L.
, 2005, “Enriched Performance Measure Approach for Reliability-Based Design Optimization
,” AIAA J.
0001-1452, 43
(4
), pp. 874
–884
.6.
Yang
, R. J.
, and Gu
, L.
, 2004, “Experience With Approximate Reliability-Based Optimization Methods
,” Struct. Multidiscip. Optim.
1615-147X, 26
(1-2
), pp. 152
–159
.7.
Wang
, L. P.
, and Kodiyalam
, S.
, 2002, “An Efficient Method for Probabilistic and Robust Design With Non-Normal Distributions
,” 43rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics, and Materials Conference
, Denver, CO, Apr. 22–25.8.
Liang
, J. H.
, Mourelatos
, Z. P.
, and Nikolaidis
, E.
, 2007, “A Single-Loop Approach for System Reliability-Based Design Optimization
,” ASME J. Mech. Des.
0161-8458, 129
(12
), pp. 1215
–1224
.9.
Du
, X.
, Sudjianto
, A.
, and Huang
, B. Q.
, 2005, “Reliability-Based Design With the Mixture of Random and Interval Variables
,” ASME J. Mech. Des.
0161-8458, 127
(6
), pp. 1068
–1076
.10.
Wu
, Y. T.
, Shin
, Y.
, Sues
, R.
, and Cesare
, M.
, 2001, “Safety-Factor Based Approach for Probabilistic-Based Design Optimization
,” 42nd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference and Exhibit
, Seattle, WA, Apr. 16–19.11.
Wu
, Y. T.
, and Wang
, W.
, 1998, “Efficient Probabilistic Design by Converting Reliability Constraints to Approximately Equivalent Deterministic Constraints
,” J. Integr. Des. Process Sci.
1092-0617, 2
(4
), pp. 13
–21
.12.
Du
, X.
, and Chen
, W.
, 2004, “Sequential Optimization and Reliability Assessment Method for Efficient Probabilistic Design
,” ASME J. Mech. Des.
0161-8458, 126
(2
), pp. 225
–233
.13.
Du
, X.
, 2008, “Saddlepoint Approximation for Sequential Optimization and Reliability Analysis
,” ASME J. Mech. Des.
0161-8458, 130
(1
), pp. 011011
–011022
.14.
Du
, X.
, Guo
, J.
, and Beeram
, H.
, 2008, “Sequential Optimization and Reliability Assessment for Multidisciplinary Systems Design
,” Struct. Multidiscip. Optim.
1615-147X, 35
(2
), pp. 117
–130
.15.
McDonald
, M.
, and Mahadevan
, S.
, 2008, “Design Optimization With System-Level Reliability Constraints
,” ASME J. Mech. Des.
0161-8458, 130
(2
), p. 021403
.16.
Kokkolaras
, M.
, Mourelatos
, Z. P.
, and Papalambros
, P. Y.
, 2006, “Design Optimization of Hierarchically Decomposed Multilevel Systems Under Uncertainty
,” ASME J. Mech. Des.
0161-8458, 128
(2
), pp. 503
–508
.17.
Gunawan
, S.
, and Papalambros
, P. Y.
, 2007, “Reliability Optimization With Mixed Continuous-Discrete Random Variables and Parameters
,” ASME J. Mech. Des.
0161-8458, 129
(2
), pp. 158
–165
.18.
Gunawan
, S.
, and Papalambros
, P. Y.
, 2005, “Reliability Optimization Involving Mixed Continuous-Discrete Uncertainties
,” International Design Engineering Technical Conferences and Computers and Information in Engineering Conference (IDETC/CIE)
, Long Beach, CA, Sept. 24–28.19.
Kuschel
, N.
, and Rackwitz
, R.
, 2000, “Optimal Design Under Time-Variant Reliability Constraints
,” Struct. Safety
0167-4730, 22
(2
), pp. 113
–127
.20.
Streicher
, H.
, and Rackwitz
, R.
, 2004, “Time-Variant Reliability-Oriented Structural Optimization and a Renewal Model for Life-Cycle Costing
,” Probab. Eng. Mech.
0266-8920, 19
(1-2
), pp. 171
–183
.21.
Pascual
, R.
, Meruane
, V.
, and Rey
, P. A.
, 2008, “On the Effect of Downtime and Budget Constraint on Preventive and Replacement Policies
,” Reliab. Eng. Syst. Saf.
0951-8320, 93
(1
), pp. 144
–151
.22.
Chukova
, S.
, Arnold
, R.
, and Wang
, D. Q.
, 2004, “Warranty Analysis: An Approach to Modeling Imperfect Repairs
,” Int. J. Prod. Econ.
0925-5273, 89
(1
), pp. 57
–68
.23.
Wu
, C. -C.
, Chou
, C. -Y.
, and Huang
, C.
, 2007, “Optimal Burn-In Time and Warranty Length Under Fully Renewing Combination Free Replacement and Pro-Rata Warranty
,” Reliab. Eng. Syst. Saf.
0951-8320, 92
(7
), pp. 914
–920
.24.
Murthy
, D. N. P.
, and Djamaludin
, I.
, 2002, “New Product Warranty: A Literature Review
,” Int. J. Prod. Econ.
0925-5273, 79
(3
), pp. 231
–260
.25.
Murthy
, D. N. P.
, 2006, “Product Warranty and Reliability
,” Ann. Operat. Res.
0254-5330, 143
, pp. 133
–146
.26.
Vittal
, S.
, and Hajela
, P.
, 2004, “Probabilistic Design and Optimization of Aging Structures
,” Tenth AIAA/ISSMO Multidisciplinary Analysis and Optimization
, New York, Aug. 30–Sept. 1.27.
Frangopol
, D. M.
, and Maute
, K.
, 2003, “Life-Cycle Reliability-Based Optimization of Civil and Aerospace Structures
,” Comput. Struct.
0045-7949, 81
(7
), pp. 397
–410
.28.
Biondini
, F.
, and Frangopol
, D. M.
, 2008, “Probabilistic Limit Analysis and Lifetime Prediction of Concrete Structures
,” Struct. Infrastruct. Eng.
1573-2479, 4
(5
), pp. 399
–412
.29.
Kong
, J. S.
, and Frangogol
, D. M.
, 2005, “Probabilistic Optimization of Aging Structures Considering Maintenance and Failure Costs
,” J. Struct. Eng.
0733-9445, 131
(4
), pp. 600
–616
.30.
Wang
, Z. L.
, Du
, X.
, and Huang
, H. -Z.
, 2008, “Reliability-Based Lifecycle Optimization with Maintenance Consideration
,” 14th ISSAT Conference on Reliability and Quality in Design
, Orlando, FL, Aug. 7–9.31.
Abdul-Nour
, G.
, Beaudoin
, H.
, Ouellet
, P.
, Rochette
, R.
, and Lambert
, S.
, 1998, “A Reliability Based Maintenance Policy: A Case Study
,” Comput. Ind. Eng.
0360-8352, 35
(3-4
), pp. 591
–594
.32.
Wang
, H. Z.
, and Pham
, H.
, 1999, “Some Maintenance Models and Availability With Imperfect Maintenance in Production Systems
,” Ann. Operat. Res.
0254-5330, 91
(0
), pp. 305
–318
.33.
Monga
, A.
, and Zuo
, M. J.
, 1998, “Optimal System Design Considering Maintenance and Warranty
,” Comput. Oper. Res.
0305-0548, 25
(9
), pp. 691
–705
.34.
Nguyen
, D. G.
, and Murthy
, D. N. P.
, 1984, “A General Model for Estimating Warranty Costs for Repairable Products
,” IIE Trans.
0740-817X, 16
(4
), pp. 379
–386
.35.
Ross
, S. M.
, 1992, Applied Probability Models With Optimization Application
, Dover
, New York
, pp. 34
–36
.36.
Huang
, H. -Z.
, Liu
, Z. J.
, and Murthy
, D. N. P.
, 2007, “Optimal Reliability, Warranty and Price for New Products
,” IIE Trans.
0740-817X, 39
(8
), pp. 819
–827
.37.
Asiedu
, Y.
, and Gu
, P.
, 1998, “Product Life Cycle Cost Analysis: State of the Art Review
,” Int. J. Prod. Res.
0020-7543, 36
(4
), pp. 883
–908
.38.
Xie
, M.
, 1989, “On the Solution of Renewal-Type Integral Equations
,” Commun. Stat.-Simul. Comput.
0361-0918, 18
(1
), pp. 281
–293
.39.
Sommer
, A. M.
, Nowak
, A. S.
, and Thoft-Christensen
, P.
, 1993, “Probability-Based Bridge Inspection Strategy
,” J. Struct. Eng.
0733-9445, 119
(12
), pp. 3520
–3536
.40.
Zhang
, B.
, and Xie
, Y. B.
, 1989, “Two-Body Microcutting Wear Model Part III: Stable Profile Height Distribution of a Worn Surface
,” Wear
0043-1648, 129
, pp. 59
–66
.Copyright © 2010
by American Society of Mechanical Engineers
You do not currently have access to this content.