Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings

International Conference on Instrumentation, Measurement, Circuits and Systems (ICIMCS 2011)

By
Chen Ming
Chen Ming
Search for other works by this author on:
ISBN:
9780791859902
No. of Pages:
1400
Publisher:
ASME Press
Publication date:
2011

Usually in Shell and Tube heat exchangers, at the time of assembly of the Tube bundle assembly, the gasket seating face of the flanges and the gasket seating face of the Tube sheet might get distorted and damaged. Due to this distortion and damage there is a possibility of leakage during hydrotest of the equipment. To correct this distortion and damages, it is necessary to do machining in that area to attain a flat surface with required surface finish. But due to the weight and size of the assemblies it is difficult to move the equipment to the floor boring...

Abstract
Keywords:
Introduction
Literature Survey
Methodology of Construction
Working
Lead Screw and Nut — Torque Calculation
Benefits
Scope for Improvement
Conclusion
Acknowledgements
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal