Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings

Geological Engineering: Proceedings of the 1st International Conference (ICGE 2007)

Editor
Baosong Ma
Baosong Ma
Search for other works by this author on:
ISBN:
9780791802922
No. of Pages:
1760
Publisher:
ASME Press
Publication date:
2009

Yesanguan tunnel is a key project of the whole Yiwan railway. This paper is based on field investigation and test analysis, firstly researches karst distributing rule of this zone, and studies grade separation of karst water bursting hazard of this tunnel construction through analyzing information. Then analytical methods are discussed. Finally the risky zone and risky grade of karst water bursting hazard of the construction are confirmd through analyzing specific geological and hydrogeological conditions of Yesanguan tunnel. All this result provides the basis for the definition of key prevention sectors of tunnel construction.

This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal