1-6 of 6
Keywords: construction
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Proc. ASME. IPC2020, Volume 2: Pipeline Safety Management Systems; Project Management, Design, Construction, and Environmental Issues; Strain Based Design; Risk and Reliability; Northern, Offshore, and Production Pipelines, V002T02A009, September 28–30, 2020
Paper No: IPC2020-9402
...DESIGN AND CONSTRUCTION CHALLENGES OF A ROPED INSULATED PIPELINE Neetu Prasad1, Graeme King2, Arfeen Najeeb3 1Pipeline Engineering Manager, Worley, Calgary, Alberta, Canada 2Pipeline Specialist, Tensor Engineering and Worley, Calgary, Alberta, Canada 3Pipeline Project Manager, Husky Energy, Calgary...
Proceedings Papers

Proc. ASME. IPC2020, Volume 3: Operations, Monitoring, and Maintenance; Materials and Joining, V003T05A030, September 28–30, 2020
Paper No: IPC2020-9685
... FEA and the API 1104 Annex A ECA procedures. A concept of a safety margin was introduced to quantify the conservatism 1 Contacting author: bliu@cres-americas.com built into the Annex A procedures and to derive a maximum al- lowable misalignment value. KEYWORDS Construction, engineering assessments...
Proceedings Papers

Proc. ASME. IPC2012, Volume 1: Upstream Pipelines; Project Management; Design and Construction; Environment; Facilities Integrity Management; Operations and Maintenance; Pipeline Automation and Measurement, 199-208, September 24–28, 2012
Paper No: IPC2012-90508
... The selection of a pipeline route is of great importance in minimizing the levels of construction and maintenance cost and in determining the outcomes of reliability, environmental impact, social impact and development timeframe. The decision of choosing one route over another must be informed...
Proceedings Papers

Proc. ASME. IPC2010, 2010 8th International Pipeline Conference, Volume 3, 167-172, September 27–October 1, 2010
Paper No: IPC2010-31358
... a sensitive watercourse assessment team (SWAT) was established to provide a biophysical and construction assessment of selected watercourses to be crossed by a proposed pipeline project in western Canada. The SWAT comprised a fisheries biologist, a pipeline watercourse construction specialist and other...
Proceedings Papers

Proc. ASME. IPC2002, 4th International Pipeline Conference, Parts A and B, 1251-1261, September 29–October 3, 2002
Paper No: IPC2002-27428
... rebuild, fast track, design, construction, Proceedings of IPC’02 4th International Pipeline Conference ptem anada r cee i f I ’ th I t r ti l i li er 2 428d EPCM project. The Gas Compressor Station epair in an oil fire on new Station, with bigger e art technology, was to truction Team was able demolition...
Proceedings Papers

Proc. ASME. IPC2004, 2004 International Pipeline Conference, Volumes 1, 2, and 3, 2393-2405, October 4–8, 2004
Paper No: IPC2004-0260
... 10 12 2008 During the construction of a pipeline project, and especially a pipeline project in a Northern environment, it is essential that the pipe coating selection is suitable for the conditions that will be encountered in the field. The pipe coating system must also provide...