Horizontal Directional Drilling (HDD) is increasingly being used as a technique to install pipeline through challenging conditions. With this increased use, several post-installation geotechnical issues have, quite literally, surfaced, often many months or years following the original installation. These issues include sinkhole development around the entry/exit points for the HDD operations and settlement of the surface above the HDD bore path. Both can be attributed to two major factors, those involving unfavourable ground conditions and those involving problematic installation procedures. Several examples of each of these factors are described along with mitigation measures designed to prevent both sinkhole and settlement from occurring following HDD installation. Case histories from two large HDD crossings are subsequently presented which illustrate the potential magnitude of these issues and the steps that are often required for repair; the first from a crossing of the Fraser River outside of Vancouver, Canada, and the second from a crossing of a major river in north-central Argentina. In both of these cases, large sinkholes formed behind the HDD exit points, resulting in property damage and possibly threatening neighboring utilities. Site investigation and design techniques implemented to minimise the potential for sinkhole development and settlement are discussed, and several remediation options used in the cases histories are presented.
Skip Nav Destination
2004 International Pipeline Conference
October 4–8, 2004
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute
ISBN:
0-7918-4176-6
PROCEEDINGS PAPER
Post-Installation Geotechnical Issues Associated With Large-Scale HDD Crossings
Alex Baumgard,
Alex Baumgard
BGC Engineering Inc., Vancouver, BC, Canada
Search for other works by this author on:
K. Wayne Savigny,
K. Wayne Savigny
BGC Engineering Inc., Vancouver, BC, Canada
Search for other works by this author on:
Peter Cocciolo
Peter Cocciolo
Terasen Pipelines Inc., Vancouver, BC, Canada
Search for other works by this author on:
Alex Baumgard
BGC Engineering Inc., Vancouver, BC, Canada
K. Wayne Savigny
BGC Engineering Inc., Vancouver, BC, Canada
Peter Cocciolo
Terasen Pipelines Inc., Vancouver, BC, Canada
Paper No:
IPC2004-0168, pp. 275-282; 8 pages
Published Online:
December 4, 2008
Citation
Baumgard, A, Savigny, KW, & Cocciolo, P. "Post-Installation Geotechnical Issues Associated With Large-Scale HDD Crossings." Proceedings of the 2004 International Pipeline Conference. 2004 International Pipeline Conference, Volumes 1, 2, and 3. Calgary, Alberta, Canada. October 4–8, 2004. pp. 275-282. ASME. https://doi.org/10.1115/IPC2004-0168
Download citation file:
9
Views
0
Citations
Related Proceedings Papers
Related Articles
Stress Induced Permanent Magnetic Signal Degradation of Perpendicular Magnetic Recording System
J. Tribol (January,2009)
Static Analysis of Flying Characteristics of the Head Slider by Using an Optimization Technique
J. Tribol (January,1994)
Related Chapters
Horizontal Directional Drilling
Pipeline Geohazards: Planning, Design, Construction and Operations
Classification Model to Detect Failed HDD Components
Intelligent Engineering Systems through Artificial Neural Networks Volume 18
Introduction
Pipeline Geo-Environmental Design and Geohazard Management