Medicine Bow Wind Project

[+] Author and Article Information
L. L. Nelson

Bureau of Reclamation, Lower Missouri Region, Denver, Colo. 80225

J. Sol. Energy Eng 104(2), 77-83 (May 01, 1982) (7 pages) doi:10.1115/1.3266289 History: Received March 04, 1982; Online November 11, 2009

Abstract

The Bureau of Reclamation (Bureau) conducted studies for a wind turbine field of 100 MW at a site near Medicine Bow, Wyoming, one of the windiest areas in the United States. The wind turbine system would be electrically interconnected to the existing Federal power grid through the substation at Medicine Bow. Power output from the wind turbines would thus be integrated with the existing hydroelectric system, which serves as the energy storage system. An analysis based on “willingness to pay” was developed. Based on information from the Department of Energy’s Western Area Power Administration (Western), it was assumed that 90 mills per kWh would represent the “willingness to pay” for onpeak power, and 45 mills per kWh for offpeak power. The report concludes that a 100-MW wind field at Medicine Bow has economic and financial feasibility. The Bureau’s construction of the Medicine Bow wind field could demonstrate to the industry the feasibility of wind energy.

Copyright © 1982 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In